Article REC10
Stepped Fencing Poles
The stepped pole for fencing is manufactured by joining tubes of different diameters, properly machined at the ends, and assembled through automatic circumferential welding.
m
|
m
|
mm
|
mm
|
mm
|
kg
|
m²
|
m x m x m
|
|
---|---|---|---|---|---|---|---|---|
REC10 | 9 | 0,8 | 139 | 76 | 3 | 85 | 3,31 | 1,20 × 1,20 × 0,90 |
-
The poles are CE marked by applying an adhesive label (n° 1608 CPD P028).
The pole is produced by a company certified to UNI EN ISO 9001:2015 and authorized to issue CE marking, in accordance with the current legislation (EU Regulation No. 305/2011). The label, which confirms compliance with CE standards and is affixed to each pole, must include: reference standard UNI EN 1090-1, manufacturer’s signature, year of manufacture, product code, and the CE marking authorization certificate number.
-
The poles are made from S235JR steel, with characteristics conforming to UNI EN 10219 standards.
-
Dimensional tolerances comply with the UNI EN 1090 standard.
-
- UNI EN 1461 – Hot-dip galvanizing coatings on finished iron products and steel items.
- UNI EN 10219 – Cold-formed welded hollow sections for structural use, made from non-alloy and fine-grain steels.
- UNI EN 15614 – Specification and qualification of welding procedures for metallic materials. Qualification testing of welding procedures.
Part 1: Arc and gas welding of steels. - UNI EN ISO 15609 – Specification and qualification of welding procedures for metallic materials. Welding procedure specification.
Part 2: Gas welding. - UNI EN 1090-2 – Execution of steel and aluminum structures.
Part 2: Technical requirements for steel structures.
STEPPED FENCING POLE model REC10
The stepped buried fencing pole model REC10, manufactured by NCM, is made by joining induction-welded tubes of different diameters, which are suitably processed at the ends; these are then assembled using an automatic circumferential welding process.
The pole is equipped with the following standard features:
. Hot-dip galvanization in a molten zinc bath in compliance with UNI EN ISO 1461.
. Longitudinally welded wire passing hooks every meter along the entire length.
. PVC cap for top closure.
Materials:
The poles are made of S235 JR steel with characteristics conforming to UNI EN 10219.
The dimensional tolerances comply with the UNI EN 1090 standard.
Dimensional characteristics of the pole:
Above ground height | : | mm | 9000 |
Burying | : | mm | 800 |
Base diameter | : | mm | 139 |
Base thickness | : | mm | 3 |
Top diameter | : | mm | 76 |
Top thickness | : | mm | 3 |
CE Marking:
The poles are CE marked by applying an adhesive label (n° 1608 CPD P028).
The pole is produced by a company certified to UNI EN ISO 9001:2015 and authorized to issue CE marking, in accordance with the current legislation (EU Regulation No. 305/2011). The label, which confirms compliance with CE standards and is affixed to each pole, must include: reference standard UNI EN 1090-1, manufacturer’s signature, year of manufacture, product code, and the CE marking authorization certificate number.
Any additional painting, after galvanization, with colors chosen by the project supervisor, is achieved through a thermosetting powder coating process. Each pole will be protected with bubble wrap.